dragline

5 day mission to move 3000t dragline 5km

Premium Content 5 day mission to move 3000t dragline 5km

The massive mine excavator ‘walked’ across the Peak Downs Highway this week.

WATCH: Monster dragline takes four months to reach mine

WATCH: Monster dragline takes four months to reach mine

The 3000 tonne dragline is making its way to the Peak Down Hwy

Peak Downs Hwy traffic affected by BMA dragline move

Peak Downs Hwy traffic affected by BMA dragline move

Motorists are reminded to observe signage during the disruption